Manufacturing And Control System
Did You Know That There Are 5 Major Levels In Manufacturing Planning and Control (MPC).
The first one is Production Plan. It was a planning and ready the raw materials, the workers to fullfill manufacturing orders on time.
Second is Master Production Schedule. It was a plan for individual raw materials to be produced in each time period such as production and inventory.
Third is Materials Requirement Plan. It is a production planning, scheduling, and inventory control system used to manage manufacturing processes.
Lastly is Purchasing And Production Activity Control. It refers to the purchase of materials of right quality in a right quantity at a reasonable price and at a right time
Each level varies in purpose, time span and level of detail. Since each level is for a different time span and different purposes, each differ in the following: