MPS, MRP & PAC
The master production schedule (MPS) is a plan for individual commodities to be produced in each time period.
Purchasing and production activity control (PAC) represent the implementation and control phase of the production and control system. Purchasing is responsible for establishing and controlling the flow of raw materials into factory. PAC is responsible for planning and controlling the flow of work through the factory.

Comments
Post a Comment